Pre-Startup Checklist
To ensure continued satisfactory operation, perform the following checks or inspections before each startup.
-
Ensure the generator is level.
-
Check the remaining operating hours before the next service is due.
-
Ensure that the generator is properly grounded / earthed with an approved grounding electrode as per Electrical Code requirements and site conditions.
-
Ensure that all generator circuit breakers are turned off.
-
Make all required electrical connections between the required loads and the generator connection panel.
-
Ensure that all loads connected to the generator are turned off.
Downstream devices should be bonded to the System Bond connector located next to the System Ground connector.